x
uploads/power house.jpg

power house 發電廠;〔美國〕強有力者。

power lathe

This thesis concentrates on regenerating corporation vitality by the way both of innovating corporation structure , management system and of altering organization behavior mode in order for corporation to meet challenging environment in 21st century . it begins with analyzing the general factors affecting pro and against the corporation vitality . and then , firstly certain institutional rearrangement in corporation is suggested to solve the fundamental problem in the power house of corporation 第二、在組織層次上,首先企業組織結構的基本模式-直線職能部制和事業部制本身存在阻礙企業活力的缺陷,其次在以出資者為中心的公司治理結構和傳統泰勒主義的管理模式中關于生產要素中人力資源從屬地位和人類行為反復常的假設與現實社會發展不符,阻礙了企業活力發揮。

As a project financed by yunfeng and ming tomb hydroelectric power station , the study on “ mathematical model for dam safety monitoring and dynamic inverse model for underground power house “ was conducted . according to the data observed in - situ , the under - fitting problems in regression models for dam safety monitoring were discussed , and the computational parameters and boundary conditions of underground structures were determined on the base of dynamic inverse mathematical model 本文利用大壩運行監測資料和水電站廠房結構的振動測試數據,對水工建筑物的正反分析模型中的相關問題進行了探討,分析了大壩安全監測回歸模型存在的欠擬合現象,建立了通用的結構動力最優化反分析模型,實現用戶優化算法對復雜結構的直接調用和優化計算,在計算模型方法的基礎上對云峰寬縫重力壩的安全狀況和十三陵抽水蓄能電站的動力反演問題進行實例分析。

Based on the real machine test and the analysis on the prototype observation data from lijiaxia hydropower station , the structural vibration characteristics of the power house is analyzed through the comparison made between the results of the measurements on both the operation stability of the hydropower generating units and the vibration of the power house 摘要以李家峽水電站真機試驗為背景,在分析原型觀測數據的基礎上,通過機組運行穩定性測試結果與廠房振動測試結果的對比,得出了廠房結構振動的特有規律。

This thesis discussed the design principia and desige method from the engineering point of view . , and give out its own view about the selection of development of the hydropower station , layout of the underground cavern mass , selection of method for stability analysis on the surrounding rocks and support , and design of the rock anchorage crane beam . some conclusions assumed from the research and design of jiangkou power house is quite useful for all the underground hydropower station 本文結合江口電站,從工程的角度對地下廠房的設計原則、設計重點進行了詳細論述,對電站開發方式的選擇,地下洞室群的布置特點,圍巖的穩定性分析及支護方式選擇以及巖錨吊車梁的設計方法進行了研究和論證。本文的觀點和結論對地下廠房工程設計有著一定的普遍意義。

In light of the increment of capacity of hydrogenerating units in shitang hydropower plant , the vibration influence of the power house induced by increment of unit capacity and improvement has been studied , after checking and analying the vibration displacement and frequency of the power house structure 摘要結合石塘水電站增容改造工程實例,對廠房結構的振動位移和頻率進行了測試與分析,研究了水輪發電機增容改造對電站主廠房的振動影響。

And we would venture into the garbage place and you know many other things in the house . it s not always important . and also into a power house , we went into the electricity house which is just behind the house , beyond the house , and we got shocked so then we die there 然后我們想進到房子的更里面看一看,結果冒然走到放垃圾的地方你們知道房子里有許多的東西不是每樣都那么重要我們也可能走到屋后或屋外的發電室,然后觸電死在那里。

With evaluating the security of the power house structure based on the test result , this article analyses the possibility of the hydropower plant with increment of capacity of original units , and puts forward corresponding research method and result 根據測試結果對廠房結構的安全性進行了評估,探討了在電站原有機組的基礎上進行增容的可行性,并提出了相應的研究方法和結果。

Fire protection , and surveillabce works as follows : electrical : 22 . 8kv ; 27 , 800kva ; three loading centers located in the power house , factory , and office building ; generator 2 800kw 電氣: 22 . 8kv供電設備容量三處負載及配電中心分布于動力室與廠房發電機容量2800kw ,供緊急負載使用本配電系統處使用數字式電驛及電表,符臺現代化之電力監控新潮流。

It is suggested to introduce the structural vibration measurement on the power house into the relevant field experiment for hydropower station ; that is quite significant to the safety monitoring on the structure of the power house concerned 建議在今后的水電站現場試驗中引入對廠房結構的振動測試,這對廠房結構的安全監控意義重大。

“ power house ” industrial chillers are perfect assistants for industry machinery due to the stable performance , strong cooling capacity , pretty appearance , simple installation and easy maintenance 力源牌工業冷水機是工業機械的理想配套設備,該產品具有性能穩定、冷量強勁、外觀美觀、小巧玲瓏、安裝簡單和維修方便等優點。

By sandeep datta , new delhi : even when india is emerging as a major technology power house , the availability of cheap labour is making it an ideal place for the dumping or burning electronic - waste 新德里:即使印度已經被視為全球新興的科技勢力,然而這里的廉價勞工卻也使得印度成為電子廢棄物被傾倒或者燃燒的絕佳場所。

Milling system : cracker , muller , milling machine , conveyor , hoist , material house , fluidized bed furnace , helix mixing blade , ripe power house , static dust catcher and shaking motor (四)制粉系統:由鄂破機、粉碎機、磨機、輸送機、提升機、生料倉、沸騰爐、螺旋攪刀、熟粉料倉、靜電除塵器及震打電機組成。

This paper carries on the 3d finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of huang river as the carrier 摘要以黃河上游擬建的某燈泡貫流式水電站為載體,對廠房壩段整體進行了三維有限元結構分析。

Research on vibration influence of main power house induced by increment of capacity of hydrogenerating unit and improvement 水輪發電機增容改造對主廠房的振動影響研究

Structural features of main power houses for large thermal power plants and improvement of their construction technology 加強電建外委施工安全管理的對策研究

Design code for heating ventilation and air conditioning of power house of hydropower station 水力發電廠廠房采暖通風與空氣調節設計規程

Sanitary : plumbing at factory , power house , office buildings , etc . , piping 衛生:含廠房維修工廠動力室辦公室等衛生設備。

Mechanical analysis and design of crane beam on rock wall for underground power house 地下廠房巖壁吊車梁的力學分析及設計

Additional units were installed in a second power house in 1985 新加的設備是在1985年安裝在第二個發電房里的。